Calculation Of Total Wash Under The Bridge Based On Guideline Flow Velocities
Downloads
Many years of study, modeling, and theoretical studies of the working conditions of bridge crossings have made it possible to significantly improve the methods of determining the size of clear spans under large and medium-sized bridges. Prof. The further development of the method, founded by NA Belelyubsky, consisted in calculating the flow rate at which the under-bridge washout stops. The need for velocity calculation arose after observations of the phenomenon of bridge span washes often stopping at average flow velocities rather than domestic velocities.
Design of bridge crossings on railways MI Voronin, NN Kantor, VA Kopylenko and others - M.: Transport, 1990.-287 p. (Bible Code 624.2/8, P791).
Rothenburg IS, Volnov VS, Polyakov MP Bridge transitions. -M.: Higher School, 1977.-328p.
Rotenburg IS, Volnov VS Examples of pavement design transitions. -M.: Higher School, 1969.- 284 p.
Babkov VF, Andreev OV Highway design part 2. M: Transport, 1979.-407 p.
Technical and economic bases of designing highways and bridge crossings (reference) / EV Boldakov, GA Fedotov, BF Perevoznikov and others - M.: Transport, 1981.-207p.
Copyright (c) 2024 Rakhimov S Herzod Shavkatovich, Shokhbos Soibjon, Ramshid Mukhtar

This work is licensed under a Creative Commons Attribution 4.0 International License.














